Repository navigation
docs(pm-stack): Phase 2 design record — CF sync topology + edge relay (#8569) - #11241
Conversation
…edge relay decisions (queue task 20170)
Codex Review Summary: ❌ FailedThis comment shows the latest Codex review activity on this pull request.
ℹ️ About Codex in GitHubYour team has set up Codex to review pull requests in this repo. Reviews are triggered when you
Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings. |
|
Warning Review limit reachedYou've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository. Next included review available in 27 minutes. View limit details
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. |
|
You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard. |
What
The Phase-2 design record for #8569:
doc/2026-11-17_design_pm8569_notifications_phase2.md.The parent design (
pm-stack-notifications-design-2026-11-11.md) already ruled: board/aggregator to Workers is NO-GO; a small edge notification relay (one Worker + onepm-notifyDurable Object) is GO. Phase 1 (#8568) is closed. This record decides the five things the ruling left open:mirrorIdidempotency key (retry until acked); subscription mirror: full-snapshot replace under a monotonic seq (self-healing, seq regression rejected); heartbeat: bidirectional — its response drains pending edge answers via pull/ack on every contact, with the Phase-1 catcher still the single ledger writer. A per-startstackEpochmakes recovery decidable at the edge.stack.silentfrom here), (2) event mirror as silent mirror with a soak check, (3) edge answer intake, (4) cron narrowing to the daily DO canary; any further send cutover is separately reviewed, outside this split.Doc-only (one new file), treefmt-formatted. Queue task 20170 (lane code-a). No closing keyword for #8569 — the issue stays open as the Phase-2 program tracker; the worker updates it with the split.
Open in [code]smith · Need help on this PR? Tag
@codesmith-botwith what you need.